Davis Universal Anemometer Interface for Vantage Pro2 Manuel d'utilisateur Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
2
Tools for Setup
Inaddition,youwillneedsomeorallofthefollowingmaterials:
•Adjustablewrenchor7/16ʺwrench
•Compassorlocalareamap(toadjustwinddirection,ifneeded)
•Drilland3/16ʺ(5mm)drillbit(ifmountingonaverticalsurface)
•Carpenterslevel(ifmountingonaverticalsurface)
If you are installing a Davis Integrated Sensor Suite (ISS) or
Anemometer Transmitter Kit and the non-Davis anemometer at
the same time:
InstallyourISSfirst,followingtheinstructionsintheinstallationmanual.How
ever,skipthestepsthatdirectyoutoconnecttheanemometercabletotheSIM.
Whenyouarereadytomounttheanemometer(fortheISS,afteryouhave
mountedtheraincollectorsideoftheISS),followtheinstructionsinthismanual
startingwith
“MounttheNewAnemometeronpage4.
Installation Steps
Thefollowingisanoutlineofthestepsnecessarytoinstallananemometerwith
theUniversalAnemometerInterface.Thesestepsareusedassectionheadings
inthismanualandareexplainedingreaterdetailintheappropriatesection.
•Removetheoldanemometerfromitscurrentlocationanddisconnectthe
anemometerfromtheISStransmitter(ifnecessary)
•Mountthenewanemometer
•Mounttheinterfaceshelter
Connecttheanemometercabletotheanemometer
•Insertthebatteryintheinterfaceshelter
Connecttheanemometercabletotheinterface
ConnecttheISScabletotheinterface
ConnecttheISScabletotheISSorAnemometerTransmitterKitSIM
•Configuretheconsole
Vue de la page 1
1 2 3 4 5 6 7 ... 11 12

Commentaires sur ces manuels

Pas de commentaire